Hybrid PLC Mechatronics - Chapter 18 Planning Tasks

From the beginning of this chapter, the discussion has been one of planning to not fail by running out of something. In the case of Charlie and the MTA, it was a nickel that was needed. During the remainder of the chapter, the quantity needed is time. The plan should include enough time to guarantee execution of all programs without failing. The conservative planner usually allows extra time and is more successful in implementing the overall system. Accompanying Video: PLC Series Chapter 18 - Planning Tasks (22:57) (see Additional Public Access to Materials below)
Date:
2022
Primary Material Type:
Online Course
Other Material Types:
Open Textbook
Institution:
University of Toledo
Subjects:
cycle time, interrupts, time-outs

Industry / Occupation

Industry Sector:
Manufacturing -- Miscellaneous Manufacturing -- Robotics, Mechatronics, and other Miscellaneous Manufacturing (3399)
Occupation:
Production Occupations (51-0000)

Education / Instructional Information

Instructional Program:
Engineering Technologies/Technicians (15)
Credit Type:
  • Credit
Credential Type:
  • Credential
Educational Level of Materials:
  • Upper division of Bachelors degree or equivalent
Time Required:
1 hour
Quality Assurance Organization:
OMWP Editorial Board
Quality of Online/Hybrid Course Design assured by:
  • None

Copyright / Licensing

Primary License:
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.