Hybrid PLC Mechatronics - Chapter 18 Planning Tasks
From the beginning of this chapter, the discussion has been one of planning to not fail by running out of something. In the case of Charlie and the MTA, it was a nickel that was needed. During the remainder of the chapter, the quantity needed is time. The plan should include enough time to guarantee execution of all programs without failing. The conservative planner usually allows extra time and is more successful in implementing the overall system.
Accompanying Video:
PLC Series Chapter 18 - Planning Tasks
(22:57)
(see Additional Public Access to Materials below)
- Date:
- 2022
- Primary Material Type:
- Online Course
- Other Material Types:
- Open Textbook
- Institution:
- University of Toledo
- Subjects:
- cycle time, interrupts, time-outs
Industry / Occupation
- Industry Sector:
- Manufacturing -- Miscellaneous Manufacturing -- Robotics, Mechatronics, and other Miscellaneous Manufacturing (3399)
- Occupation:
- Production Occupations (51-0000)
Education / Instructional Information
- Instructional Program:
- Engineering Technologies/Technicians (15)
- Educational Level of Materials:
-
- Upper division of Bachelors degree or equivalent
- Time Required:
- 1 hour
- Quality Assurance Organization:
- OMWP Editorial Board
- Quality of Online/Hybrid Course Design assured by:
-
Copyright / Licensing